GoGoMount

712 - Adding specific key binding option for Azure Water Strider

Is it possible to add a specific key binding option for Azure Water Strider (much like the no flying/passenger mount options)?

User When Change
tiker Jul 17, 2013 at 14:22 UTC
tantalus00 Jun 04, 2013 at 17:38 UTC Create

You must login to post a comment. Don't have an account? Register to get one!

  • 3 comments
  • Avatar of tiker tiker Jul 17, 2013 at 14:22 UTC - 0 likes

    As I posted in the forum thread: http://wow.curseforge.com/addons/gogomount/forum/53666-azure-water-strider-support/

    Quote from tiker:
    Azure Water Strider support will be summoned if you're at the water surface, don't have the option to fly from water surface enabled and don't have any faster underwater mounts (or don't set faster mounts with preferences).

    If you use the "ground only" mount key binding / macro, GoGoMount should summon one of these mounts over flying mounts if you do have the fly from water surface option enabled (but still needs more testing).Rather than adding another key binding I would prefer to optimize the current key bindings better to support this.If not then I'll consider it.

    Want to chat? You'll find me here if I'm online:
    [email protected]
    (XMPP / Jabber Group Chat)

  • Avatar of tantalus00 tantalus00 Jun 09, 2013 at 18:27 UTC - 0 likes

    @tiker: Go

    It is more of a personal preference. I don't like the water strider mount and having it come up as a random is ... irksome. I'd prefer to have it bound to a specific key, which I currently do by a macro. I figured it couldn't hurt to ask about this option. Maybe include all swimming mounts in this category, much like the option for non-flying and multi-rider mounts.

  • Avatar of tiker tiker Jun 05, 2013 at 18:03 UTC - 0 likes

    It is possible.  I don't see why there would be a need for it though.  Can you tell me how it would be useful?

  • 3 comments

Facts

Last updated
Jul 17, 2013
Reported
Jun 04, 2013
Status
Accepted - Problem reproduced / Need acknowledged.
Type
Enhancement - A change which is intended to better the project in some way
Priority
Medium - Normal priority.
Votes
0

Reported by

Possible assignees